Qualification Documents

The qualification documents can be ordered from Rotronic: RMS-VAL-DOC.

Validation Master Plan (VMP):
RMS-VMP-Vxxx-EN.docx
Detailed RMS master plan for the validation procedure.
Instruction, timeline, release, etc.
Risk Assessment (RA):
RMS-RA-Vxxx-EN.docx
System-related risks are declared, with reference to resolution methods.
Requirement Traceability Matrix (RTM):
RMS-RTM-Vxxx-EN.docx
Matrix showing how, beginning with the URS, where what is described.
User Requirements Specification (URS):
RMS-URS-Vxxx-EN.docx
The URS describes what the system should do. The URS is the responsibility of the regulated company.
Functional Requirement Specification (FRS):
RMS-FRS-Vxxx-EN.docx
Configuration and settings of the software and instruments: alarms, intervals, users, etc.
Configuration Specification (CS):
RMS-CS-Vxxx-EN.docx
System configuration and installation: server, database, operating system, etc.
Factory Acceptance Test (FAT):
RMS-FAT-Vxxx-EN.docx
Documented verification that the system meets the desired and required specifications according to written and pre-approved specifications, normally written within the CS and FRS.
Site Acceptance Test (SAT):
RMS-SAT-Vxxx-EN.docx
Documented verification that the system meets the desired and required specifications according to written and pre-approved specifications, normally written within the CS and FRS.
Installation Qualification (IQ):
RMS-IQ-Vxxx-EN.docx
Documented verification that a system is installed according to written and pre-approved specifications. Results of the CS tests.
Operation Qualification (OQ):
RMS-OQ-Vxxx-EN.docx
Documented verification that a system operates according to written and pre-approved specifications throughout specified operating ranges. Results of the FRS tests.
Performance Qualification (PQ):
RMS-PQ-Vxxx-EN.docx
Documented verification that a system is capable of performing the activities of the processes it is required to perform, according to written and pre-approved specifications, within the scope of the business process and operating environment. Results of the URS tests.